Have a project that would be good for a drone flight?
Fill out this form to request a drone flight time!
Deer Valley High School
Deer Valley High School in Antioch is getting a new football field!
A historic moment in McGuire and Hester’s rich history: Yountville Pipe Burst
A momentous day for McGuire and Hester as our dedicated crew in Yountville accomplished the longest pipe bursting operation in our company’s storied history!
UC Davis Arboretum
Our Sacramento Team is currently working on enhancing the UC Davis Arboretum and Public Garden! Check out this video about the project made by UC Davis as well as some photos we have taken recently of the project.
PM Spotlight: Shannon Saliba and Tunnel Tops Park
Hear from our very own Project Manager Shannon Saliba, as she discusses the Tunnel Tops Project!
Oakland Ballers
Oakland’s newest baseball team, the Oakland Ballers, is getting a new baseball filed at Raimondi Park!
Arden Service Area Pipe & Meter Install
Work has commenced for the Arden Service Area Ph 4/5/6 pipe and meter installation. The work to be performed under this contract includes furnishing all of the labor, materials, equipment, and associated appurtenances for the replacement, rehabilitation, and/or alignment of approximately 15,206 feet of 12-inch, 1,432 feet of 10-inch and 61,003 feet of 8-inch waterlines and associated appurtenances including fire hydrants, valves, etc. The project also consists of installation of 1,406 residential metered services, 17 commercial metered services with backflow assemblies, and 5 fire service reconnections with back flow assemblies.
Las Positas College Landscaping
Enhancing the College campus ambiance with new trees and greenery! You can read more about this project here on our website!
14th Street Safe Route
From new bike lanes to updated bus stops, comfy benches, storm drain enhancements, and more, over a mile of 14th Street is part of the City of Oakland’s 14th Street Safety Project.
Folsom Water Treatment Plant
Demolition underway at the Folsom Water Treatment Plant.
Stanford: Olmsted Road Utilities
Underground utilities work happening at Stanford!
CF&T: Loopbelt in San Leandro
The CF&T Loopbelt was put to work for a project in San Leandro moving 27 yards of pervious concrete!
Interested in learning more about McGuire and Hester Projects?
Did you know McGuire and Hester’s project page has a search function?
First, you want to head to https://www.mcguireandhester.com/ then, under “Projects” click on “all project”
Once you land on the projects page, you will notice the filters on the right-hand side.
From there you can filter projects by name, service, or market sector!
We understand that the quality of our work is our legacy for generations to come. We are committed to performing our work with the highest degree of excellence.