Park Point is a three-building office campus located in Milpitas, in the heart of the 237 corridor. The tenants at Park Point will be greeted with a new park and recreational area, which includes new landscaping, furnishings, and recreational amenities. The project site was approximately 8.31 acres and included clear and grub of the site, […]
project highlight
CF Project Highlight: Tank Foundation Pour
The TransMontaigneTerminal is a complex facility that transfers on average 139,000 barrels per day of petroleum products via pipeline and marine vessel. In addition, the Terminal has approximately 4.8 million barrels of product storage. The storage tanks hold gasoline, diesel, crude oil, and gas oil. Casey-Fogli poured concrete for the installation of two 4′ thick […]
M&H Project Highlight: Jane Stanford Way
Jane Stanford Way is the historic thoroughfare that runs through the heart of Stanford University. It is a pedestrian walking mall and the main bus/emergency vehicle route adjacent to several notable buildings, including Hoover Tower, Main Quad, and Memorial Auditorium. The project’s scope included: 3,000 lineal feet of domestic water, lake water, and reclaimed water. […]
M&H Project Highlight: Mather Airport AC Paving
Operated by Sacramento County Airport System, Mather Airport (MHR) is 20 minutes from downtown Sacramento and specializes in cargo, general aviation, and hosts the annual California Capital Airshow. In September 1993, Mather Air Force Base, east of Sacramento in then-unincorporated Rancho Cordova, was decommissioned, and the majority of the base was transferred to Sacramento County […]